Sign In | Join Free | My burrillandco.com
Home > Concrete Pump Spare Parts >

Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow

Changsha Tongchuang Mechanical Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow from wholesalers
     
    Buy cheap Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow from wholesalers
    • Buy cheap Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow from wholesalers
    • Buy cheap Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow from wholesalers
    • Buy cheap Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow from wholesalers

    Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow

    Ask Lasest Price
    Brand Name : Changsha Tongchuang Mechanical
    Model Number : 125*R300-50°+1174mm
    Price : $125
    Payment Terms : D/P, T/T
    Supply Ability : 800 Pieces/month
    Delivery Time : 7 work days
    • Product Details
    • Company Profile

    Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow

    Concrete Pump Pipeline Double-layer lengthened elbow 125*R300-50°+1174mm


    Concrete Pump Pipeline Double-layer lengthened elbow 125*R300-50°+1174mm
    NamePump truck double-layer lengthened elbow
    Product namePump Tube Elbow
    Place of originChangsha, Hunan, China
    Brand nameChangsha Tongchuang Mechanical
    Applicable modelConcrete pump truck
    Specifications and models125*R300-50°+1174mm
    Specification size1100*148*148mm
    Weight35KG
    Hardness≥HRC63
    Quality assurance(m³)80000
    MaterialCast steel
    Supply capacity800 Pieces/month
    PackingExport standard packing 1100*148*148mm
    Minimum order10
    Price$125

    Product features and advantages:

    Unique material selection, optimized process, reliable processing and high cost performance!


    Maintenance method:

    Check whether there is water leakage or slurry leakage at the joint of the pipe clamp in time, replace the seal in time if there is, and visually check the wear of the flange.


    Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow

    Quality Double Layer Concrete Pump Spare Parts Lengthened Pipeline Elbow for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Changsha Tongchuang Mechanical Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)